Mardie Salt & Potash Project

The Mardie Salt and Potash Project (Mardie or the Project) is 100% owned by Mardie Minerals Pty Ltd, a wholly owned subsidiary of BCI Minerals Limited (BCI). The Project represents a rare, sustainable opportunity to develop a large-scale, multi-generational solar evaporation operation on the Pilbara coast of Western Australia (WA).

The Pilbara coast is one of the world’s premier regions for solar salt production. Five existing solar evaporation salt projects owned by Rio Tinto and major Japanese companies have been operating successfully in this region for up to fifty years, producing a high quality and reliable salt product which is consistently in high demand in the chemical and other industries.

Mardie’s site has all the critical characteristics for establishing a large-scale solar evaporation operation, including: optimum climate conditions (high temperatures, low rainfall, low humidity, and high windspeeds); a large area (~100km2) of impermeable mudflats as an ideal floor for evaporation ponds; minimal environmental and heritage sensitivities; and a coastal location for low cost shipping to Asian markets.

At Mardie, an inexhaustible seawater resource will be concentrated through solar and wind evaporation to sustainably produce 5.35 million tonnes per annum (Mtpa) of high purity sodium chloride (NaCl) salt and 140 thousand tonnes per annum (ktpa) of sulphate of potash (SOP or K2SO4) fertiliser for supply to the growing chemical and agricultural industries over an operating life of at least 60 years.

Figure 1:  Mardie Project Layout

mardie project layout new

Salt is one of the most widely used substances on earth, with over 10,000 direct and indirect uses. It has a large and mature market with approximately 335Mtpa consumed globally. SOP is a premium fertiliser containing essential macro-nutrients (potassium and sulphur) for plant growth. It accounts for approximately 10% of the global potash market of 70Mtpa, with the majority supplied as the chloride containing muriate of potash (MOP or KCl).

A Definitive Feasibility Study (DFS) was completed in July 2020 at a cost of $20M and optimised results were released in April 2021. The DFS and its optimisation were managed by BCI with support from GR Engineering Services Limited (GRES) as lead DFS engineer, and with additional support from Worley, CMW Geosciences, Preston Consulting, RPS, Roskill, Argus Consulting, Braemar ACM Shipbroking, KPMG and others. A summary of key optimised Project parameters are compared with those of the DFS in Table 1 below.

Table 1 :  Key Project Parameters


1 – Input resource is an infinite supply of natural seawater which could continue for 100+ years.

2 – All dollar values presented in Australian dollars unless specified.
3 – Excludes working capital, funding costs and Build Own Operate / Transfer (BOO/T) items partially funded by contractors.
4 – Discount rate supported by low interest rate environment and very long project life. 7% real discount rate equates to ~9% nominal.

Mardie will be the first major salt project developed in Australia in two decades and the only Australian operation producing commercially saleable salt and SOP. It will be the largest salt operation in Australia, and with the potential expansion into newly acquired tenements (not included in the optimisation), it can become one of the largest evaporative operations globally.

Production of a high value by-product from waste seawater adds downstream processing credentials to the Project, which aligns with the WA Government’s long-standing objective for the resources industry to include secondary processing in project planning.

In addition, the Project has strong “green” credentials given 99.9% of the energy requirement is derived from natural sun and wind to evaporate seawater, as defined by an independent KPMG study.

Project Description

The primary project components are below:

  • Seawater intake pumping station and evaporation ponds
  • Salt crystallisers and salt wash plant
  • KTMS crystallisers and SOP plant
  • Port facilities
  • Supporting infrastructure

The production concept involves a time-proven and low risk process. Seawater is pumped from the ocean into the first evaporation pond and progressively concentrated via natural sun and wind evaporation energy through a series of nine evaporation ponds over an eighteen-month period. Upon reaching NaCl saturation point in Pond 9, concentrated brine is transferred to the salt crystallisers where salt precipitates in solid form. The remaining brine liquid (bitterns) is drained from the salt crystallisers and raw salt is then harvested and purified in a two-stage counter-current wash plant to produce 5.35Mtpa salt with >99.5% NaCl content.

Figure 2:  Salt Wash Plant

Salt Wash Plant new

A unique attribute of Mardie compared with WA’s five existing salt producers is that it will also produce SOP as a by-product. Bitterns from the salt crystallisers, which is deficient in sodium but rich in potassium and magnesium, is pumped to the SOP crystallisers where kainite-type mixed salts (KTMS) precipitate. Approximately 1.1Mtpa of KTMS is harvested and converted to 140ktpa of granular SOP product with >52% K2O in a chemical flotation processing plant.

Figure 3: SOP Processing Plant

SOP Processing Plant new

Final salt and SOP products will be exported from a purpose-built port facility at the Mardie site. A range of port options have been studied and a transhipment facility together with a 2.4km jetty and 4.4km dredged navigation channel to open waters best satisfies the marine environment and product volumes to be exported by BCI. The jetty has been designed to withstand a 1-in 500-year extreme weather event. The navigation channel will accommodate a 12,000 deadweight tonnes (dwt) self-propelled and self-unloading transhipment vessel (TSV).

Salt product will be conveyed from salt stockpiles to the jetty head and loaded onto the TSV at a rate of 3,000 tonnes per hour (tph). SOP will be transported by truck from a SOP storage shed to a receival hopper, conveyed to the jetty head and loaded onto the TSV at a 700tph rate. The TSV will transport product 15 nautical miles (28km) offshore to ocean-going vessels (OGVs) at anchor

Figure 4: Port and Transhipper

Port and Transhipper new

BCI is planning to ship salt to customers in OGVs ranging from Supramax (50,000dwt) to Capesize (160,000 dwt). The use of larger average OGVs will reduce overall freight costs materially compared with other WA salt operations with berth constraints. SOP can be shipped by either small vessels or together with salt shipments, where the products have customers with a common or nearby port.

A Final Investment Decision was made for the Mardie Project in October 2021. BCI is finalising the funding, approvals and tenure required to commence Main Construction in early 2022, which will allow first salt sales to be achieved by Q4 2024 and first SOP sales by Q1 2026. On 18 November 2021, BCI announced a $360m capital raising to provide a key project funding component, subject to shareholder approval.

With attractive financial returns over many decades and expansion potential from the new tenements, development of the Mardie Project should result in considerable long-term value and dividends being created for shareholders.

Please follow us

Get the latest news from ACM Resources

Keep up to date on all our company news and highlights.

Aussie Civil & Mining

Great Reasons to Join the ACM Team

Related Articles

“Navigating the Tide: Addressing the Labor Shortage in Western Australia’s Resource Sector”

Overview of the Resources Sector in Western Australia Significance and Scale Key Players and Regions Technological Advancements General Context of the Labor Shortage Issue Emergence of the Problem Contributing Factors Implications Current Responses This overview provides a foundation for understanding the resources sector in Western Australia and the labour shortage issue. The situation is dynamic, with ongoing developments in response

Read more...
ACM Founder Lydon Hollitt with some of the core HDPE team

The Vital Role of HDPE Pipelines in Australian Mining: Unveiling Their Significance and Essential Equipment

In the dynamic world of Australian mining, the significance of High-Density Polyethylene (HDPE) pipelines cannot be overstated. These pipelines have emerged as a linchpin in the industry, revolutionising the transportation of various materials, from water and slurry to chemicals and ores. This article delves into the importance of HDPE pipelines in Australian mining and sheds light on the essential equipment

Read more...

FIFO Mental Health Issues: Spotting the Signs & Getting Support

FIFO Mental Health Issues: Spotting the Signs & Getting Support Maintaining regular contact with a trusted GP can be an important life-line for tens of thousands of Australian FIFO workers who live with the ongoing stress and upheaval of spending long periods away from home. If you, or someone you know is a FIFO worker, it’s important to understand the

Read more...

POSCO acquires Ravensthorpe stake from First Quantum

Canada’s First Quantum Minerals has sold a 30 per cent share of the Ravensthorpe nickel operation in Western Australia to South Korean steel-making company POSCO for $US240 million ($310 million). First Quantum will retain a 70 per cent share in the nickel facility and will continue as the operator. POSCO and First Quantum have agreed to evaluate a strategic partnership

Read more...

Rio Tinto’s Commitment to the Future: The Strategic Vision Behind Its Sustaining Capital Investments

In the ever-evolving landscape of the global mining industry, sustainability and innovation have become paramount for companies striving to maintain competitiveness and ensure long-term viability. Rio Tinto, a leading player in the global mining and metals sector, has consistently demonstrated its commitment to these principles through its strategic investments in sustaining capital. As the company looks towards the future, its

Read more...

Hydrology in West Australian Mines: An In-Depth Exploration

Western Australia’s mining industry stands as a cornerstone of its economy, contributing significantly to both regional development and the national GDP. The extraction of minerals, including gold, iron ore, and nickel, necessitates an intricate understanding of various scientific fields, among which hydrology plays a pivotal role. Hydrology, the study of the movement, distribution, and quality of water on Earth, becomes

Read more...
ACM Founder Lydon Hollitt with some of the core HDPE team

ACM Resources’ Deployable Expertise: Premier HDPE Welding and Pipeline Solutions for the UAE

ACM Resources sets the industry benchmark by offering deployable teams of highly skilled HDPE welding technicians and pipeline experts to the rapidly evolving infrastructure sector of the United Arab Emirates. With a surge in demand for sophisticated piping systems, ACM Resources is poised to deliver excellence and precision. Engage with ACM Resources’ deployable experts to elevate your infrastructure projects in

Read more...

Subscribe to our newsletter for industry updates, new listings and more.